Shipbuilding gantry crane is a kind of great lifting capacity, large span, high lifting altitude, multi function, high efficiency of gantry crane, is special for the fragmented transport, end-to-end joint and turning operation of large ship hulls. ME shipbuilding gantry crane is used in the place of manufacturing of ship and dock. With the development of large-scale shipbuilding, Shipyard gantry crane for sale , shipbuilding gantry crane is the rapid growth of demand. Compared with the traditional portal crane, large shipbuilding gantry crane has the obvious advantage of the installation and transportation of hull sections. It spans the dock (berth), can provide on-site assembly service at the coverage plane in the dock, not only has the lifting, horizontal transport function, but also can implement hull air turnover, adjusting the fragment to the welding position of ship required.
Product Features
1) It have multiple functions of single hanging, hoisting, turnover in the air, slight horizontal turnover in the air and so on;
2) The gantry falls into two categories: single girder and double girder. To rationally utilize materials, the girder adopts optimum design of variable section;
3) The gantry rigid legs with a single column and double column type for customer choice.
4) Both the upper trolley and the lower trolley can cross each other for operation;
5) All the lifting mechanism and travelling mechanism adopts frequency conversion speed regulating;
6) On the top of the girder at the side of rigid leg is equipped a jib crane to accomplish maintenance of upper and lower trolley;
7) In order to prevent the storm attack, such safe and reliable anti-wind devices as rail clamp and ground anchor are equipped.
SAFETY FEATURES
gate switch、overload limiter、
stroke limiter、mooring device、
anti-wind device
Load capacity: | 250t-600t | (we can supply 250 ton to 600ton,more other capacity you can learn from other project) |
Span: | 60m | (Standard we could the suply span 60m, please contac our sales manager for more details) |
Lift height: | 48-70m | (We can supply 48-70m,also we can design as your request ) |
Shipping Building Gantry Crane Main Specification | |||||||
Lifting capacity | 2x25t+100t | 2x75t+100t | 2x100t+160t | 2x150t+200t | 2x400t+400t | ||
Total Lifting capacity | t | 150 | 200 | 300 | 500 | 1000 | |
Turning over capacity | t | 100 | 150 | 200 | 300 | 800 | |
Span | m | 50 | 70 | 38.5 | 175 | 185 | |
Lifting Height | Above rail | 35 | 50 | 28 | 65/10 | 76/13 | |
Below rail | 35 | 50 | 28 | 65/10 | 76/13 | ||
Max. Wheel load | KN | 260 | 320 | 330 | 700 | 750 | |
Total power | Kw | 400 | 530 | 650 | 1550 | 1500 | |
Span | m | 40~180 | |||||
Lifting Height | m | 25~60 | |||||
Working duty | A5 | ||||||
Power source | 3-Phase AC 380V50Hz or as required |
PACKING AND DELIVERY TIME
We have a complete production security system and experienced workers to ensure timely or early delivery.
Professional power.
Strength ofthe factory.
Years ofexperience.
Spot isenough.
10-15days
15-25days
30-40days
30-40days
30-35days
By National Station exporting standard plywood box,wooden palletor in 20ft & 40ft Container.Or as per your demands.