As a common lifting equipment, the double-girder bridge crane has the following selling points:
1.High load-bearing capacity: The double-girder bridge machine adopts a double-girder structure design. Through the support and cooperative work of the two beams, it can bear a large weight. It can handle heavy lifting tasks, such as hoisting large equipment, construction materials, etc.
2.Long-span operation: Double-girder bridge cranes usually have longer spans and can perform lifting operations across larger areas. This makes it suitable for locations that require large-scale coverage across construction plants, port terminals, railway sites, etc.
3.Flexible space utilization: The lifting mechanism of the double-girder bridge machine is designed to move between the two beams, maximizing the cargo area and improving space utilization. This is especially important in tight working areas to maximize lifting efficiency. Easy to operate: The double-girder bridge machine adopts a modern control system, making the operation easy and precise. Users can achieve a full range of operational control through joysticks, buttons or remote controls, including lifting, moving, steering, etc. This greatly improves the accuracy and convenience of operation. High safety: The double-girder bridge machine is equipped with a variety of safety devices, including heavy-load protection, limiters, power-off protection, etc. These devices ensure the stability and safety of the equipment during work. At the same time, the double-girder bridge machine can also be equipped with safety warning lights, sound alarm systems, etc. to ensure the safety of surrounding people.
the double-girder bridge crane has become a widely used lifting equipment due to its high load-bearing capacity, large-span operation, flexible space utilization, easy operation and high safety. It can meet various lifting needs and improve operating efficiency.
Parameter(customizable)
|
|
Lifting capacity(ton)
|
1-30
|
Working class
|
A5-A8
|
Span(m)
|
7.5-31.5
|
Working temperature
|
-25~40°C
|
Lifting speed (m/min)
|
8/0.8
|
Lifting height(m)
|
6、9、12、18、24、30
|
Travelling speed(m/min)
|
20/30
|
1. The raw material procurement process is strict and has been inspected by quality inspectors.
2. The materials used are all steel products from major steel mills, and the quality is guaranteed.
3. Strictly code into inventory.
1. Cut corners, originally used 8mm steel plate,but used 6mm for customers.
2. As shown in the picture, old equipment is often used for refurbishment.
3. Procurement of non-standard steel from small manufacturers, product quality is unstable.
S
1. Motor reducer and brake are three-in-one structure
2. Low noise, stable operation and low maintenance cost.
3. The built-in anti-drop chain can prevent the bolts from being loosened, and avoid the harm to the human body caused by the accidental fall of the motor.
1.Old-style motors: It is noisy, easy to wear, short service life, and high maintenance cost.
2. The price is low and the quality is very poor.
a
S
All wheels are heat-treated and modulated, and the surface is coated with anti-rust oil to increase the aesthetics.
s
1. Do not use splash fire modulation, easy to rust.
2. Poor bearing capacity and short service life.
3. Low price.
s
S
1. Our inverters only make the crane run more stable and safe, but also the fault alarm function of the inverter makes the maintenance of the crane easier and more intelligent.
2. The self-adjusting function of inverter allows motor to self-adjust its power output according to the load of the hoisted object at any time, thereby saving the factory costs.
The control method of the ordinary contactor allows the crane to reach the maximum power after it is started, which not only causes the whole structure of the crane to shake to a certain degree at the moment of starting, but also slowly loses the service life of the motor.
IT IS USED IN MANY FIELDS
Satisfy the users' choice under different condition.
Usage: used in factories, warehouse, material stocks to lift goods, to meet the daily lifting work.
PACKING AND DELIVERY TIME
We have a complete production security system and experienced workers to ensure timely or early delivery.
Professional power.
Strength ofthe factory.
Years ofexperience.
Spot isenough.
10-15days
15-25days
30-40days
30-40days
30-35days
By National Station exporting standard plywood box,wooden palletor in 20ft & 40ft Container.Or as per your demands.